The project involved initial and ongoing track monitoring to identify any movement during the works.
We installed access roads to protect third-party land and ensure the area was accessible at all times. 20,000 tons of Class 1A material, 12,500m2 badger netting and topsoil covering were also installed to design specification.
The project was crowned by a testimonial from Network Rail, underlining Westlin’s commitment to professionalism and reliability.
“I was very impressed with the way the site was managed, your staff were always working in a safe manner and aware of the risk and hazards on site.
“They were always easy to approach and work with and keen to ensure the works were delivered to a high standard.”